We will be doing some maintenance on our core network in Interxion. We have to move some connections in order to facilitate the introduction of extra firewalls at a future date.
As all the connections are redundant, there should no interruption to the network, however there could be two slight blips are the network figures out the new paths.
Update 26/09/09 07:05: This work has been completed with no interruption to the network.
As all the connections are redundant, there should no interruption to the network, however there could be two slight blips are the network figures out the new paths.
Update 26/09/09 07:05: This work has been completed with no interruption to the network.